|
|
July 2, 2003
| The Space Saver crew consults with the Library Director over the progress of the work. Soon the lower level will be ready for the return of books to the shelves. |
 |
 |
| Work also continues on the wiring of the brakes on the ranges, |
 |
 |
| and the installation of shelves. |
 |
 |
| Then the sky darkened, the sirens sounded and the wind and rain came. |
 |
 |
 |
 |
| Photos by Chad Hopman. |
|